Kennedy Energy Park - Phase 1 - Solar (KEPSF1)

Solar · Windlab / Eurus · Solar PV - Single axis tracking

Operational AEMO: In Service QLD1 Solar - Solar NEM data · 24 hours
15 MW
Registered nameplate capacity
24 hours revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$0.34/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
15 MW

AEMO status In Service
Project status Operational (AI)

GEM.wiki 2026 / The Wind Power lists the Phase 1 solar farm as operating/operational.

Region QLD1
Coordinates -20.87500, 144.42100 (AI)

Regen Power 2018 gives PV array coordinates at -20.875, 144.421.

MLF 0.9813
DUID KEPSF1
Owner Windlab / Eurus
Commissioned
Expected closure 2046
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Jinko
Module / inverter supplier Jinko JKM345M / JKM350M modules; SMA SC2500-EV inverter supplier
Inverter OEM SMA
Inverter model SC2500-EV
Equipment confidence high
Stats window
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST

Dispatch & revenue

12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9813
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9703
2025-07-01 0.9813

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
15 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.34/MWh
Capex total (greenfield)
$216.22M

Shown in table
$216.22M (2026 real AUD)

Reported / source value
$160.00M (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Official project announcement gives the total project cost as A$160 million for the Kennedy Park hybrid facility.

Reference
$160 million 60 MW Kennedy Park wind, solar and battery hybrid reaches financial close in Queensland (high confidence)
Source recorded 09 Jun 2026

Capex refurbishment
Capex / MW derived
$14,414,414

Shown in table
$14.41M (2026 real AUD)

Reported / source value
$10.67M (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
The source discloses total project size and solar capacity, allowing a derived per-MW figure for the solar DUID, but it is not a solar-only project cost.

Reference
$160 million 60 MW Kennedy Park wind, solar and battery hybrid reaches financial close in Queensland (medium confidence)
Source recorded 09 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

How this was derived
AEMO/Aurecon benchmark for a 20MW ground-mount solar PV project lists fixed O&M at 12,000 AUD/MW-year.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (medium confidence)
Source recorded 09 Jun 2026

Variable OPEX / MWh
$0.34

Shown in table
$0.34 (2026 real AUD)

Reported / source value
$0.25 (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
The benchmark report states variable O&M is included within fixed O&M, so no separate variable O&M value is used.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (medium confidence)
Source recorded 09 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026

Notes
Plant-specific reported total project cost of A$160 million for Kennedy Energy Park (full hybrid project: 43.2 MW wind, 15 MW solar, 2 MW / 4 MWh battery). Solar share was not separately disclosed, so capex_total_aud is the full project cost associated with the site, and capex_per_mw_aud is calculated on the 15 MW solar capacity only. Commissioning/start of operation was May 22, 2024; construction started December 2017.