Solar · Windlab / Eurus · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
07 Jun 2026 02:50 → 14 Jun 2026 02:50 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9703 |
| 2025-07-01 | 0.9813 |
| Capex total (greenfield) |
$216.22M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$14,414,414
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table How this was derived Reference |
| Variable OPEX / MWh |
$0.34
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026
Notes
Plant-specific reported total project cost of A$160 million for Kennedy Energy Park (full hybrid project: 43.2 MW wind, 15 MW solar, 2 MW / 4 MWh battery). Solar share was not separately disclosed, so capex_total_aud is the full project cost associated with the site, and capex_per_mw_aud is calculated on the 15 MW solar capacity only. Commissioning/start of operation was May 22, 2024; construction started December 2017.