13 Jun 2026 09:05 → 14 Jun 2026 09:05 AEST
| Capex total (greenfield) |
$15.15M
Shown in table Reported / source value The saved AI note for this row describes refurbishment or upgrade capex, not greenfield construction. See Capex refurbishment or run Refresh from AI for an updated source. Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,104,377
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh default |
$1.00
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026
Notes
No plant-specific greenfield construction cost for the hydro unit itself was found. The only Keepit-specific public cost figure located was NSW Budget Paper funding of $10 million for the Keepit Dam Upgrade in 2011-12, which is a dam safety upgrade and not a greenfield generator build. I therefore used that as the closest reported site-specific capital figure for the site, but it should be treated as refurbishment/upgrade-related rather than original station construction. Keepit Power Station was commissioned in 1960 per GSP Energy. Hydro operating assumptions use AEMO/Aurecon conventional hydropower benchmarks only for performance context, with hydro emissions at zero and long asset life.