Hydro · CleanCo Queensland Limited · Hydro - Run of River
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 19:35 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9642 |
| 2025-07-01 | 0.9828 |
| Capex total (greenfield) |
$29.80M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
How this was derived Reference |
| Capex / MW derived |
$1,379,691
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.43M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$66,225
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$1.66
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026
Notes
Plant-specific greenfield capex evidence located in Queensland parliamentary material: a $18 million upgrade program at Kareeya Hydro increasing capacity from 72 MW to 84 MW. This is a brownfield upgrade/refurbishment, not original greenfield construction cost, so capex_total_aud is conservatively set to the reported upgrade figure only as the closest plant-specific capital figure found. The station later operates at 88 MW per CleanCo. AEMO hydropower review indicates hydro plants typically have 80-100 year design life and major refurbishment of electro-mechanical elements every 25-30 years.