Hydro · CleanCo Queensland Limited · Hydro - Run of River
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
07 Jun 2026 05:55 → 14 Jun 2026 05:55 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9642 |
| 2025-07-01 | 0.9828 |
| Capex total (greenfield) |
$91.14M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,219,409
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$911.4k
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$42,194
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.05
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026
Notes
Plant-specific greenfield capex for Kareeya was not found in official owner/government sources. Kareeya is an existing run-of-river hydro station commissioned in 1957, with 88 MW total capacity across four 22 MW generators. The available evidence supports operating assumptions and zero direct emissions, but not a reported original construction cost. Used fallback O&M defaults only for OPEX outputs.