Hydro · CleanCo Queensland Limited · Hydro - Run of River
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
14 May 2026 15:25 → 13 Jun 2026 15:25 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9642 |
| 2025-07-01 | 0.9828 |
| Capex total (greenfield) |
$91.14M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,219,409
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table How this was derived Reference |
| Variable OPEX / MWh default |
$1.00
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026
Notes
CleanCo states Kareeya Hydro has been operating for more than 60 years and that hydroelectric schemes can remain operational for more than 80 years. No project-specific greenfield capex was found in owner/government sources. For hydro O&M, the most relevant official benchmark found is AEMO/Aurecon's 2024 Energy Technology Cost and Parameters Review, which notes conventional hydropower has site-specific economics, relatively small maintenance and rehabilitation needs, and very long economic life; however, no single Kareeya-specific O&M value was identified in the available sources.