Solar · Iraak Sun Farm Pty Ltd · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
06 Jun 2026 23:25 → 13 Jun 2026 23:25 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.8506 |
| 2025-07-01 | 0.8895 |
| Capex total (greenfield) |
$143.30M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$3.31M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$31,646
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026
Notes
No plant-specific greenfield construction cost was found in official owner/developer/government sources. Used AEMO 2024 technical parameter review for single-axis-tracking solar PV O&M assumption; capex left blank rather than substituting a benchmark because a project-specific investment figure was not located. Plant is described as 112.5 MWp and completed/commissioned in 2019.