Karadoc Solar Farm (KARSF1)

Solar · Iraak Sun Farm Pty Ltd · Solar PV - Single axis tracking

Operational AEMO: In Service VIC1 Solar - Solar NEM data · 30 days
105 MW
Registered nameplate capacity
30 days revenue
$310.1k
Capacity factor
9.2%
Revenue / MWh
$44.97
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
105 MW

AEMO status In Service
Project status Operational (AI)

SMA Australia (2018) and Atmos Renewables project page note commercial operations reached in December 2018.

Region VIC1
Coordinates -34.41000, 142.26000 (AI)

Wikipedia/Wikidata coordinates for Karadoc Solar Farm near Iraak, Victoria.

MLF 0.8895
DUID KARSF1
Owner Iraak Sun Farm Pty Ltd
Commissioned Dec 2018
Expected closure 2048
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM GCL Technology Holdings
Module / inverter supplier Module / inverter supplier
Inverter OEM SMA Solar Technology
Inverter model Sunny Central 2750-EV
Equipment confidence high
Stats window
15 May 2026 07:05 → 14 Jun 2026 07:05 AEST

Dispatch & revenue

15 May 2026 07:05 → 14 Jun 2026 07:05 AEST

Energy revenue (× MLF)
$310.1k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
6,896.9 MWh
Available
8,192.1 MWh
Curtailed
1,295.2 MWh
Curtailment
15.8%
of available
MLF used
0.8895
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8506
2025-07-01 0.8895

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
105 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$143.30M

Shown in table
$143.30M (2026 real AUD)

Reported / source value
$135.85M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$3.31M

Shown in table
$3.31M (2026 real AUD)

Reported / source value
$3.14M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$31,646

Shown in table
$31.6k (2026 real AUD)

Reported / source value
$30.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Older AEMO-linked source used only as an O&M proxy for single-axis tracking PV.

Reference
Fuel and Technology Cost Review Report (medium confidence)
Source recorded 09 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026

Notes
No plant-specific greenfield construction cost was found in official owner/developer/government sources. Used AEMO 2024 technical parameter review for single-axis-tracking solar PV O&M assumption; capex left blank rather than substituting a benchmark because a project-specific investment figure was not located. Plant is described as 112.5 MWp and completed/commissioned in 2019.

Sources