Wind · Kaban Wind Farm Trust · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
14 Jun 2026 00:00 → 14 Jun 2026 03:10 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9605 |
| 2025-07-01 | 0.9696 |
| Capex total (greenfield) |
$460.20M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,934,943
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$5.66M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$36,070
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific reported total project cost found for the 157 MW Kaban Green Power Hub: approximately A$370 million. Kaban Wind Farm DUID capacity is 156.8 MW, so per-MW capex is calculated from the reported total and the registered capacity. No refurbishment cost identified. Fixed O&M uses AEMO/GHD 2025 onshore wind estimate of A$29,000/MW/year; variable O&M is included in fixed component in that source.