Junee Solar Farm (JUNEESF1)

Solar · Junee Operationsco Pty Ltd as trustee for Junee Operations Trust · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 20h
36 MW
Registered nameplate capacity
20h revenue
$352
Capacity factor
1.5%
Revenue / MWh
$32.38
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
36 MW

AEMO status In Service
Project status Operational (AI)

Junee Solar Farm website (juneesolarfarm.com.au) states construction is complete and the project is operational (2024).

Region NSW1
Coordinates

Transgrid participant document states the site is approximately 29 km northeast of Junee, NSW, but no precise coordinates were found.

MLF 0.9220
DUID JUNEESF1
Owner Junee Operationsco Pty Ltd as trustee for Junee Operations Trust
Commissioned
Expected closure 2050
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Equipment confidence low
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 20:25 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 20:25 AEST

Energy revenue (× MLF)
$352
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
10.9 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9220
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8752
2025-07-01 0.9220

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
36 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$38.74M

Shown in table
$38.74M (2026 real AUD)

Reported / source value
$29.28M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Planning portal record for the proposed Junee Solar Farm lists a capital investment value of $29,284,752.

Reference
Solar Photovoltaic Energy Facility - 25Mw | Planning Portal - Department of Planning and Environment (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$1,075,714

Shown in table
$1.08M (2026 real AUD)

Reported / source value
$813.2k (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated as total project value divided by the registered 36.01 MW capacity.

Reference
Solar Photovoltaic Energy Facility - 25Mw | Planning Portal - Department of Planning and Environment (high confidence)
Source recorded 08 Jun 2026

Fixed OPEX (annual)
$571.6k

Shown in table
$571.6k (2026 real AUD)

Reported / source value
$432.4k (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated from 36.01 MW × $12,000/MW-year.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (high confidence)
Source recorded 08 Jun 2026

Fixed OPEX / MW-yr
$15,873

Shown in table
$15.9k (2026 real AUD)

Reported / source value
$12.0k (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO/Aurecon benchmark for a 20MW ground-mount solar PV plant gives fixed O&M of $12,000 per MWp-year and states variable O&M is included in the fixed component.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Solar PV benchmark does not separate variable O&M; it is included in fixed O&M.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (high confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Plant-specific greenfield capital investment value of $29.284752 million was found in NSW planning portal documentation for the proposed Junee Solar Farm (2018 approval record). This is a reported project-level value and is closer to the registered 36.01 MW unit than the local council's rounded 'Junee Solar Farm = $30 million' reference. For O&M, AEMO/Aurecon solar PV benchmark fixed O&M of $12,000/MWp-year was used; variable O&M is included in fixed O&M in that benchmark. Economic life of 30 years taken from AEMO/Aurecon solar PV benchmark. No project-specific refurbishment cost or fuel assumptions found.