12 Jun 2026 21:15 → 13 Jun 2026 21:15 AEST
| Capex total (greenfield) |
$46.30M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,215,021
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh default |
$1.00
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific greenfield capex found in Snowy Hydro's 30 June 2010 announcement: $30 million for the 14.4 MW Jounama Small Hydro Power Station. No verified refurbishment cost found. Hydro plants do not have a meaningful fuel heat rate in the same way thermal units do.