Jemalong Solar (JEMALNG1)

Solar · Genex Power · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 30 days
55 MW
Registered nameplate capacity
30 days revenue
$181.0k
Capacity factor
9.8%
Revenue / MWh
$46.66
Est. SRMC
$0.32/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
55 MW

AEMO status In Service
Project status Operational (AI)

Genex project page states the Jemalong Solar Project has achieved practical completion and is fully operational (genexpower.com.au, 2022).

Region NSW1
Coordinates -33.40800, 147.64700 (AI)

Wikipedia coordinates for Jemalong Solar Farm: 33°24′29″S 147°38′49″E (Wikipedia).

MLF 0.8923
DUID JEMALNG1
Owner Genex Power
Commissioned Dec 2021
Expected closure 2050
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Jinko
Module / inverter supplier NextTracker
Inverter OEM SMA
Inverter model
Equipment confidence high
Stats window
15 May 2026 02:20 → 14 Jun 2026 02:20 AEST

Dispatch & revenue

15 May 2026 02:20 → 14 Jun 2026 02:20 AEST

Energy revenue (× MLF)
$181.0k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
3,878.4 MWh
Available
3,993.1 MWh
Curtailed
134.7 MWh
Curtailment
3.4%
of available
MLF used
0.8923
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8943
2025-07-01 0.8923

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
55 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.32/MWh
Capex total (greenfield)
$115.38M

Shown in table
$115.38M (2026 real AUD)

Reported / source value
$90.00M (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Genex states the Jemalong Solar Project project cost was approximately A$90 million.

Reference
50MW Jemalong Solar Project - Genex (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$2,097,902

Shown in table
$2.10M (2026 real AUD)

Reported / source value
$1.64M (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$1.41M

Shown in table
$1.41M (2026 real AUD)

Reported / source value
$1.00M (2020 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Fixed OPEX / MW-yr
$25,641

Shown in table
$25.6k (2026 real AUD)

Reported / source value
$20.0k (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific O&M figure was found; fallback default used.

Variable OPEX / MWh
$0.32

Shown in table
$0.32 (2026 real AUD)

Reported / source value
$0.25 (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific variable O&M figure was found; fallback default used.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Genex’s project page lists Jemalong Solar as a 50 MW single-axis tracking asset with project cost of ~A$90M. The user-provided 55 MW capacity implies an implied capex of A$1.64M/MW if scaled to 55 MW, but the reported plant figure is for the 50 MW project. No refurbishment capex identified.