Solar · Genex Power · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
07 Jun 2026 05:55 → 14 Jun 2026 05:55 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.8943 |
| 2025-07-01 | 0.8923 |
| Capex total (greenfield) |
$115.38M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,097,902
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.41M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$25,641
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.32
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Genex’s project page lists Jemalong Solar as a 50 MW single-axis tracking asset with project cost of ~A$90M. The user-provided 55 MW capacity implies an implied capex of A$1.64M/MW if scaled to 55 MW, but the reported plant figure is for the 50 MW project. No refurbishment capex identified.