Jeeralang B (JLB02)

Gas Peakers · EnergyAustralia Ecogen Pty Ltd · Turbine - OCGT

Operational AEMO: In Service VIC1 Fossil - Natural Gas Pipeline NEM data · 18h
76 MW
Registered nameplate capacity
18h revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$137.71/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
76 MW

AEMO status In Service
Project status Operational (AI)

EnergyAustralia Jeeralang Power Station page (energyaustralia.com.au) describes Jeeralang as an existing peaking plant with seven OCGTs in service.

Region VIC1
Coordinates -38.27503, 146.42330 (AI)

Global Energy Monitor / GEO map coordinates for Jeeralang OCGT Power Plant (gem.wiki) show lat -38.275028, lon 146.423298.

MLF 0.9768
DUID JLB02
Owner EnergyAustralia Ecogen Pty Ltd
Commissioned
Expected closure 2039
Closure date
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM GE Vernova
Turbine / engine model MS9001
Equipment confidence high
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 17:30 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 17:30 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
306.2 MWh
Curtailed
306.2 MWh
Curtailment
100.0%
of available
MLF used
0.9768
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9789
2025-07-01 0.9768

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
76 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$137.71/MWh
Capex total (greenfield)
$96.20M

Shown in table
$96.20M (2026 real AUD)

Reported / source value
$91.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
$81.88M

Shown in table
$81.88M (2026 real AUD)

Reported / source value
$75.00M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as brownfield refurbishment/upgrade proxy only; not greenfield original plant capex.

Reference
Major upgrade for Jeeralang power station (low confidence)
Source recorded 08 Jun 2026

Capex / MW derived
$1,265,823

Shown in table
$1.27M (2026 real AUD)

Reported / source value
$1.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$3.70M

Shown in table
$3.70M (2026 real AUD)

Reported / source value
$3.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$48,630

Shown in table
$48.6k (2026 real AUD)

Reported / source value
$46.1k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
OCGT benchmark fixed O&M per MW-year from AEMO/Aurecon review.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$4.94

Shown in table
$4.94 (2026 real AUD)

Reported / source value
$4.68 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
OCGT benchmark variable O&M from AEMO/Aurecon review.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
$12.66

Shown in table
$12.66 (2026 real AUD)

Reported / source value
$12.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific fuel price found; server-side fallback retained.

Heat rate GJ/MWh
10.49

Shown in table
$10.49 (2026 real AUD)

How this was derived
Used as the OCGT heat-rate benchmark.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No reliable plant-specific greenfield construction cost was found for Jeeralang B / JLB02. A news report from 2023 states an estimated cost of $75 million for one new Jeeralang B unit, but this appears to refer to a brownfield unit replacement/upgrade rather than original plant construction, so it is recorded as refurbishment capex only. Jeeralang was acquired by EnergyAustralia in 2018; the plant served as an intermediate/peaking gas-fired station. O&M and heat-rate parameters were taken from AEMO/Aurecon technology review assumptions for OCGT. Fixed O&M was normalized to annual dollars using the 2024 review value multiplied by 76 MW.

Sources