Gas Peakers · EnergyAustralia Ecogen Pty Ltd · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
01 Jun 2026 00:00 → 13 Jun 2026 23:45 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9789 |
| 2025-07-01 | 0.9768 |
| Capex total (greenfield) |
$96.20M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
$81.88M
Shown in table Reported / source value How this was derived Reference |
| Capex / MW derived |
$1,265,823
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$3.70M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$48,630
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$4.94
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$12.66
Shown in table Reported / source value How this was derived |
| Heat rate GJ/MWh |
10.49
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No reliable plant-specific greenfield construction cost was found for Jeeralang B / JLB02. A news report from 2023 states an estimated cost of $75 million for one new Jeeralang B unit, but this appears to refer to a brownfield unit replacement/upgrade rather than original plant construction, so it is recorded as refurbishment capex only. Jeeralang was acquired by EnergyAustralia in 2018; the plant served as an intermediate/peaking gas-fired station. O&M and heat-rate parameters were taken from AEMO/Aurecon technology review assumptions for OCGT. Fixed O&M was normalized to annual dollars using the 2024 review value multiplied by 76 MW.