Jeeralang B (JLB01)

Gas Peakers · EnergyAustralia Ecogen Pty Ltd · Turbine - OCGT

Operational AEMO: In Service VIC1 Fossil - Natural Gas Pipeline NEM data · 24 hours
76 MW
Registered nameplate capacity
24 hours revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$128.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
76 MW

AEMO status In Service
Project status Operational (AI)

EnergyAustralia project page describes Jeeralang as a peaking plant with seven open cycle gas turbines; AEMO register lists the unit as In Service.

Region VIC1
Coordinates -38.27503, 146.42330 (AI)

Global Energy Monitor map coordinates for Jeeralang power station (gem.wiki), corroborated by EnergyAustralia stating it is about 6 km south of Morwell.

MLF 0.9768
DUID JLB01
Owner EnergyAustralia Ecogen Pty Ltd
Commissioned
Expected closure 2039
Closure date
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM GE Vernova
Turbine / engine model MS9001
Equipment confidence high
Stats window
13 Jun 2026 07:35 → 14 Jun 2026 07:35 AEST

Dispatch & revenue

13 Jun 2026 07:35 → 14 Jun 2026 07:35 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9768
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9789
2025-07-01 0.9768

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
76 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$128.50/MWh
Capex total (greenfield)
$96.20M

Shown in table
$96.20M (2026 real AUD)

Reported / source value
$91.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,265,823

Shown in table
$1.27M (2026 real AUD)

Reported / source value
$1.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$45,000

Shown in table
$45.0k (2026 real AUD)

Variable OPEX / MWh default
$2.50

Shown in table
$2.50 (2026 real AUD)

Fuel cost / GJ default
$12.00

Shown in table
$12.00 (2026 real AUD)

Heat rate GJ/MWh default
10.50

Shown in table
$10.50 (2026 real AUD)

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No plant-specific greenfield capex announcement was found for Jeeralang B (JLB01). Public sources identify Jeeralang as an existing gas-fired station with seven OCGTs and a 450 MW total site capacity, and indicate the station was commissioned in 1979/around 1979-1980; however, they do not provide a site-specific original construction cost for the JLB01 unit. Because no verified plant-level capex or refurbishment cost was located, financial and operating assumptions remain unfilled pending further review.

Sources