Jeeralang A (JLA04)

Gas Peakers · EnergyAustralia Ecogen Py Ltd · Turbine - OCGT

Operational AEMO: In Service VIC1 Fossil - Natural Gas Pipeline NEM data · 18h
53 MW
Registered nameplate capacity
18h revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$177.20/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
53 MW

AEMO status In Service
Project status Operational (AI)

EnergyAustralia Jeeralang Power Station page (in service peaking plant); Wikipedia/Latitude.to confirm existing operating station.

Region VIC1
Coordinates -38.27430, 146.42560 (AI)

Latitude.to Jeeralang Power Station coordinates (-38.2743, 146.4256); EnergyAustralia page places it ~6 km south of Morwell.

MLF 0.9768
DUID JLA04
Owner EnergyAustralia Ecogen Py Ltd
Commissioned
Expected closure 2039
Closure date
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM GE
Turbine / engine model LM6000
Equipment confidence low
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 17:50 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 17:50 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
220.5 MWh
Curtailed
220.5 MWh
Curtailment
100.0%
of available
MLF used
0.9768
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9789
2025-07-01 0.9768

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
53 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$177.20/MWh
Capex total (greenfield)
$87.85M

Shown in table
$87.85M (2026 real AUD)

Reported / source value
$63.60M (2016 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,657,459

Shown in table
$1.66M (2026 real AUD)

Reported / source value
$1.20M (2016 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$1.07M

Shown in table
$1.07M (2026 real AUD)

Reported / source value
$771.4k (2016 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$20,104

Shown in table
$20.1k (2026 real AUD)

Reported / source value
$14.6k (2016 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Provides a benchmark fixed O&M value explicitly associated with Jeeralang A in the AEMO material.

Reference
Retail electricity price history and projections - Public (medium confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$12.20

Shown in table
$12.20 (2026 real AUD)

Reported / source value
$8.83 (2016 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Provides a benchmark variable O&M value explicitly associated with Jeeralang A in the AEMO material.

Reference
Retail electricity price history and projections - Public (medium confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ default
$12.00

Shown in table
$12.00 (2026 real AUD)

Heat rate GJ/MWh
13.75

Shown in table
$13.75 (2026 real AUD)

How this was derived
Used the AEMO heat-rate table excerpt that lists Jeeralang A and its heat-rate values; the model selected the 13.75 GJ/MWh value consistent with the Jeeralang A line in the AEMO/NEMStats-derived material.

Reference
Heat rates Encapsulates the efficiency of thermal generators (high confidence)
Source recorded 08 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No plant-specific greenfield capex announcement was found for Jeeralang A/JLA04. The plant is an existing asset commissioned in 1979, so a construction cost is not readily inferable from public owner disclosures. O&M and heat-rate values were taken from AEMO heat-rate / benchmark material for Jeeralang A, but fuel price, emissions intensity, asset life, and capex remain unverified for this specific unit.

Sources