Gas Peakers · EnergyAustralia Ecogen Py Ltd · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9789 |
| 2025-07-01 | 0.9768 |
| Capex total (greenfield) |
$67.09M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,265,823
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$2.01M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$38,000
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$8.54
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$12.66
Shown in table Reported / source value How this was derived |
| Heat rate GJ/MWh |
10.50
Shown in table How this was derived |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No reliable plant-specific greenfield capex announcement found for Jeeralang A/JLA03. EnergyAustralia describes Jeeralang as a seven-unit open-cycle gas turbine peaking plant with 450 MW total capacity and notes it was purchased in 2018. O&M and performance assumptions use AEMO/Aurecon 2024 OCGT benchmark values where plant-specific data was not available. Capacity used for fixed O&M scaling is 53 MW as provided by the user; public source pages describe the whole Jeeralang station rather than the single DUID unit.