Jeeralang A (JLA02)

Gas Peakers · EnergyAustralia Ecogen Py Ltd · Turbine - OCGT

Operational AEMO: In Service VIC1 Fossil - Natural Gas Pipeline NEM data · 7 days
53 MW
Registered nameplate capacity
7 days revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$128.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
53 MW

AEMO status In Service
Project status Operational (AI)

EnergyAustralia Jeeralang Power Station page (operational peaking plant; in-service gas turbines)

Region VIC1
Coordinates -38.27430, 146.42560 (AI)

Latitude.to Jeeralang Power Station coordinates; corroborated by IPFS/Wikipedia coordinates

MLF 0.9768
DUID JLA02
Owner EnergyAustralia Ecogen Py Ltd
Commissioned
Expected closure 2039
Closure date
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM GE
Turbine / engine model LM6000
Equipment confidence medium
Stats window
06 Jun 2026 22:25 → 13 Jun 2026 22:25 AEST

Dispatch & revenue

06 Jun 2026 22:25 → 13 Jun 2026 22:25 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
8,082.0 MWh
Curtailed
8,082.0 MWh
Curtailment
100.0%
of available
MLF used
0.9768
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9789
2025-07-01 0.9768

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
53 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$128.50/MWh
Capex total (greenfield)
$67.09M

Shown in table
$67.09M (2026 real AUD)

Reported / source value
$63.60M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific original build cost was found in the searched official sources; avoided substituting a benchmark as reported capex.

Capex refurbishment
Capex / MW derived
$1,265,823

Shown in table
$1.27M (2026 real AUD)

Reported / source value
$1.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$45,000

Shown in table
$45.0k (2026 real AUD)

How this was derived
No plant-specific or benchmark O&M value was extracted because the requested capex/O&M search did not yield a suitable source and the answer must remain source-backed.

Variable OPEX / MWh default
$2.50

Shown in table
$2.50 (2026 real AUD)

How this was derived
No source-backed variable O&M value was identified.

Fuel cost / GJ default
$12.00

Shown in table
$12.00 (2026 real AUD)

Heat rate GJ/MWh default
10.50

Shown in table
$10.50 (2026 real AUD)

How this was derived
No source-backed heat rate value was identified.

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
Jeeralang Power Station is described by EnergyAustralia as seven open-cycle gas turbines with total capacity 450 MW, and by CLP as a gas-fired peaking station with 445 MW gross capacity. Sources indicate the plant was brought into operation in 1999 and acquired by EnergyAustralia in 2018. No reliable plant-specific capex announcement for the original build was found, so capex fields are left null rather than inferred from benchmarks.

Sources

  • capex_total_aud (low)
  • capex_year (low)
  • emissions_intensity_tco2_mwh (low)
  • fixed_opex_per_mw_year_aud (low)
  • generator_identityOur history | EnergyAustralia (high)
  • heat_rate_gj_per_mwh (low)
  • variable_opex_per_mwh_aud (low)