Gas Peakers · EnergyAustralia Ecogen Py Ltd · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
06 Jun 2026 22:25 → 13 Jun 2026 22:25 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9789 |
| 2025-07-01 | 0.9768 |
| Capex total (greenfield) |
$67.09M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,265,823
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$45,000
Shown in table How this was derived |
| Variable OPEX / MWh default |
$2.50
Shown in table How this was derived |
| Fuel cost / GJ default |
$12.00
Shown in table |
| Heat rate GJ/MWh default |
10.50
Shown in table How this was derived |
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Jeeralang Power Station is described by EnergyAustralia as seven open-cycle gas turbines with total capacity 450 MW, and by CLP as a gas-fired peaking station with 445 MW gross capacity. Sources indicate the plant was brought into operation in 1999 and acquired by EnergyAustralia in 2018. No reliable plant-specific capex announcement for the original build was found, so capex fields are left null rather than inferred from benchmarks.