Gas Peakers · EDL LFG NSW Pty Ltd · Reciprocating Engine - Spark ignition
15 May 2026 07:05 → 14 Jun 2026 07:05 AEST
| Capex total (greenfield) |
$10.12M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,401,408
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$145.8k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$63,380
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$15.85
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ default |
$6.00
Shown in table |
| Heat rate GJ/MWh default |
9.00
Shown in table |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield capex announcement was found for Jacks Gully / JGULLY after searching owner, government, and planning sources. Existing sources confirm the plant is a landfill-gas reciprocating-engine facility at Jacks Gully with 2.3 MW registered capacity and EDL operation. For O&M, the nearest official benchmark found was AEMO's 2025 reciprocating-engine retirement/O&M review, used as a proxy because a landfill-gas-specific cost set was not located. Emissions intensity uses a site-specific public database value consistent with landfill-gas generation.