Gas Peakers · Snowy Hydro Limited · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2025-03-25 | 0.9767 |
| 2025-07-01 | 0.9692 |
| Capex total (greenfield) |
$589.27M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,571,391
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$5.80M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$15,469
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$15.05
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$13.10
Shown in table Reported / source value How this was derived |
| Heat rate GJ/MWh |
10.49
Shown in table How this was derived Reference |
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Greenfield Hunter Power Project target cost was reported by Snowy Hydro as $950 million after the 2023 project reset. The site has 660 MW initially available to the grid, but the registered unit capacity is 375 MW for HUNTER2; per-MW capex is therefore calculated using the DUID capacity provided by the user. O&M and performance values are taken from AEMO/Aurecon 2024 technology-cost review for large OCGT-style gas turbines. Heat rate source is an AEMO/Aurecon table for large gas turbines; used as an OCGT proxy.