Gas Peakers · Snowy Hydro Limited · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
12 Jun 2026 15:25 → 13 Jun 2026 15:25 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2025-03-25 | 0.9767 |
| 2025-07-01 | 0.9692 |
| Capex total (greenfield) |
$1,037.12M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,765,648
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$5.76M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$15,357
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$15.05
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$13.10
Shown in table Reported / source value |
| Heat rate GJ/MWh |
9.77
Shown in table How this was derived Reference |
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Snowy Hydro’s Hunter Power Project is the operating name for Kurri Kurri Power Station. The project’s total target cost was reported as $950 million in Snowy Hydro’s August 2023 reset announcement. The Snowy Hydro project page describes two OCGTs and 660 MW supplied initially. AEMO 2024 technology review values were used only for O&M and performance fallback for a large GT/OCGT analogue, not for capex.