Solar · Hughenden Solar Pty Ltd as Trustee for Hughenden Solar Trust · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 19:35 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9385 |
| 2025-07-01 | 0.9516 |
| Capex total (greenfield) |
$27.93M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,331,967
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$257.8k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$12,295
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific greenfield construction cost for Hughenden Sun Farm/HUGSF1 was found in the searched official and public sources. AEMO/CSIRO benchmark assumptions were used for operating cost only: fixed O&M of AUD 12,000 per MW DC-year for a 20 MW ground-mount single-axis tracking solar PV project, with variable O&M included in fixed O&M. Using the plant's 20.97 MW capacity gives an estimated fixed O&M of AUD 251,970/year. Asset life assumed at 30 years per AEMO hypothetical solar PV project. Capex left null because project-specific reported capex was not located and benchmark capex should not be used where a plant-specific figure is absent from the search set.