Solar · ESCO SOLAR FARM 7 PTY LTD · Solar PV - Single axis tracking
14 May 2026 17:10 → 13 Jun 2026 17:10 AEST
| Capex total (greenfield) |
$379.10M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,191,064
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh |
$0.26
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific reported capital estimate found for the Horsham project at $370 million. The project is now branded SEC Renewable Energy Park – Horsham and includes a 119 MW solar farm plus a 100 MW / 2-hour BESS; the reported figure appears to cover the integrated project rather than the solar DUID alone, so capex_per_mw is calculated on the registered 118.8 MW solar capacity only as requested. No owner-reported plant-specific fixed O&M figure found in the available sources; variable O&M default retained from user fallback. Project completion is stated for 2027, while construction began in February/November 2024 depending on source.