Horsham Solar Farm

Solar · ESCO SOLAR FARM 7 PTY LTD · Solar PV - Single axis tracking

Development AEMO: Committed Solar - Solar NEM data · 24 hours
119 MW
Registered nameplate capacity
Est. SRMC
$0.26/MWh
Key information
Capacity
119 MW

AEMO status Committed
Project status Development (AI)

Coordinates

DUID
Owner ESCO SOLAR FARM 7 PTY LTD
Commissioned Dec 2026
Expected closure 2066
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
12 Jun 2026 13:15 → 13 Jun 2026 13:15 AEST

Dispatch & revenue

12 Jun 2026 13:15 → 13 Jun 2026 13:15 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
119 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.26/MWh
Capex total (greenfield)
$379.10M

Shown in table
$379.10M (2026 real AUD)

Reported / source value
$370.00M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Annual report corroborates the project capital estimate.

Reference
SEC Annual Report (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$3,191,064

Shown in table
$3.19M (2026 real AUD)

Reported / source value
$3.11M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Per-MW capex calculated from the reported project investment and the site capacity supplied by the user.

Reference
SEC - SEC Renewable Energy Park - Horsham (medium confidence)
Source recorded 08 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh
$0.26

Shown in table
$0.26 (2026 real AUD)

Reported / source value
$0.25 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
User-provided internal technology default used because no plant-specific O&M source was found.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Plant-specific reported capital estimate found for the Horsham project at $370 million. The project is now branded SEC Renewable Energy Park – Horsham and includes a 119 MW solar farm plus a 100 MW / 2-hour BESS; the reported figure appears to cover the integrated project rather than the solar DUID alone, so capex_per_mw is calculated on the registered 118.8 MW solar capacity only as requested. No owner-reported plant-specific fixed O&M figure found in the available sources; variable O&M default retained from user fallback. Project completion is stated for 2027, while construction began in February/November 2024 depending on source.