Hillston Sun Farm (HILLSTN1)

Solar · Hillston Sun Farm Operations Pty Ltd ATF Hillston · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 30 days
110 MW
Registered nameplate capacity
30 days revenue
$507.5k
Capacity factor
11.9%
Revenue / MWh
$53.76
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
110 MW

AEMO status In Service
Project status Operational (AI)

Energy Source & Distribution, 2022: Hillston Sun Farm reached 100% generation and was described as operating/full generation.

Region NSW1
Coordinates -34.56600, 145.50700 (AI)

Hillston Sun Farm project website: located 3.5km south of Hillston, NSW; Power Technology/NSW planning references place it in Carrathool Shire near Hillston.

MLF 0.8888
DUID HILLSTN1
Owner Hillston Sun Farm Operations Pty Ltd ATF Hillston
Commissioned Jul 2022
Expected closure 2046
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Canadian Solar
Module / inverter supplier module supply and EPC
Inverter OEM Sungrow
Inverter model SG250HX
Equipment confidence low
Stats window
15 May 2026 03:10 → 14 Jun 2026 03:10 AEST

Dispatch & revenue

15 May 2026 03:10 → 14 Jun 2026 03:10 AEST

Energy revenue (× MLF)
$507.5k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
9,438.8 MWh
Available
9,455.2 MWh
Curtailed
45.1 MWh
Curtailment
0.5%
of available
MLF used
0.8888
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8482
2025-07-01 0.8888

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
110 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$150.84M

Shown in table
$150.84M (2026 real AUD)

Reported / source value
$143.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$1.39M

Shown in table
$1.39M (2026 real AUD)

Reported / source value
$1.43M (2024 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Fixed OPEX / MW-yr
$12,658

Shown in table
$12.7k (2026 real AUD)

Reported / source value
$12.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No plant-specific greenfield capex announcement was found in official owner/developer/government sources during this search. AEMO GenCost benchmark for utility-scale single-axis tracking solar PV was used only for operating assumptions and not for capex. Hillston Sun Farm is a 119 MWdc solar PV development completed in March 2022 and at final acceptance in July 2022. For O&M, the AEMO/Aurecon 2024 review gives fixed O&M of $12,000/MWp-year for single-axis tracking utility-scale solar PV, with variable O&M included in the fixed component and a 30-year design life.

Sources