Hawkesdale Wind Farm (HD1WF1)

Wind · Hawkesdale Asset Pty Ltd as trustee for Hawkesdale Asset Trust · Wind Turbine - Onshore

Operational AEMO: In Service VIC1 Wind - Wind NEM data · 24 hours
97 MW
Registered nameplate capacity
24 hours revenue
$-1.5k
Capacity factor
18.1%
Revenue / MWh
$-3.51
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
97 MW

AEMO status In Service
Project status Operational (AI)

About Amazon Australia (2024) says operations begin and the wind farm is commercially operational; GPG project page also shows the project in operation.

Region VIC1
Coordinates -38.17900, 142.05400 (AI)

GPG project page and AusNet project page place Hawkesdale Wind Farm near Hawkesdale, 30 km north-west of Warrnambool and 5 km south-east of Hawkesdale VIC.

MLF 0.9865
DUID HD1WF1
Owner Hawkesdale Asset Pty Ltd as trustee for Hawkesdale Asset Trust
Commissioned Oct 2024
Expected closure 2054
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Vestas
Turbine model V136-4.2 MW
Equipment confidence high
Stats window
12 Jun 2026 15:25 → 13 Jun 2026 15:25 AEST

Dispatch & revenue

12 Jun 2026 15:25 → 13 Jun 2026 15:25 AEST

Energy revenue (× MLF)
$-1.5k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
419.9 MWh
Available
1,120.9 MWh
Curtailed
824.6 MWh
Curtailment
73.6%
of available
MLF used
0.9865
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9809
2025-07-01 0.9865

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
97 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$248.95M

Shown in table
$248.95M (2026 real AUD)

Reported / source value
$236.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Reported total project investment for Hawkesdale Wind Farm.

Reference
Naturgy grows its presence in Australia with a new wind farm becoming operational (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$2,577,072

Shown in table
$2.58M (2026 real AUD)

Reported / source value
$2.44M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated per-MW capex using the reported total investment and registered capacity.

Reference
Naturgy grows its presence in Australia with a new wind farm becoming operational (high confidence)
Source recorded 08 Jun 2026

Fixed OPEX (annual)
$2.85M

Shown in table
$2.85M (2026 real AUD)

Reported / source value
$2.71M (2024 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

How this was derived
Calculated annual fixed O&M from benchmark per-MW cost and capacity.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Fixed OPEX / MW-yr
$29,536

Shown in table
$29.5k (2026 real AUD)

Reported / source value
$28.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO/Aurecon onshore wind fixed O&M benchmark used as fallback.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark indicates no separate variable O&M for onshore wind.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Plant-specific reported total investment from Naturgy/GPG press release. The project was announced as 97 MW in company materials but the registered DUID capacity is 96.6 MW; capex_per_mw_aud is calculated using 96.6 MW. No refurbishment capex identified. Fixed O&M uses AEMO/Aurecon 2024 onshore wind benchmark; variable O&M assumed nil for wind, and emissions intensity is zero.

Sources