Wind · Hawkesdale Asset Pty Ltd as trustee for Hawkesdale Asset Trust · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
12 Jun 2026 15:25 → 13 Jun 2026 15:25 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9809 |
| 2025-07-01 | 0.9865 |
| Capex total (greenfield) |
$248.95M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,577,072
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$2.85M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$29,536
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific reported total investment from Naturgy/GPG press release. The project was announced as 97 MW in company materials but the registered DUID capacity is 96.6 MW; capex_per_mw_aud is calculated using 96.6 MW. No refurbishment capex identified. Fixed O&M uses AEMO/Aurecon 2024 onshore wind benchmark; variable O&M assumed nil for wind, and emissions intensity is zero.