BESS · South Australian Water Corporation · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
15 May 2026 07:55 → 14 Jun 2026 07:55 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-09-06 | 1.0043 |
| 2025-07-01 | 1.0024 |
| Capex total (greenfield) |
$3.26M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$145.6k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Could not verify a plant-specific greenfield capex for HVWWBA1 from SA Water, government, or AEMO sources in the available search results. The site is identified by AEMO as Happy Valley BESS (DUID HVWWBA1), but the retrieved sources did not disclose a project cost. O&M and performance fields therefore use the provided server-side battery defaults; fixed OPEX annualised as 25,000 × 5.52 MW = 138,000 AUD/yr, rounded to 137,700 in the source-free estimate.