Wind · Infrastructure Capital Group Limited · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9526 |
| 2025-07-01 | 0.9608 |
| Capex total (greenfield) |
$323.43M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,529,799
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$2.79M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$39,106
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific greenfield capex was not found in a primary owner/government disclosure. The capex figure used is a reported 2015 financing/refinancing amount associated with Hallett Hill 2, not a direct original-construction cost announcement. Onshore wind O&M uses AEMO/Aurecon 2024 benchmark fallback. The plant is operational since 2009 and has 34 x 2.1 MW turbines.