Hallett Stage 2 Hallett Hill (HALLWF2)

Wind · Infrastructure Capital Group Limited · Wind Turbine - Onshore

Operational AEMO: In Service SA1 Wind - Wind NEM data · 7 days
71 MW
Registered nameplate capacity
7 days revenue
$65.5k
Capacity factor
33.4%
Revenue / MWh
$16.33
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
71 MW

AEMO status In Service
Project status Operational (AI)

Wind Prospect project page says Hallett wind farms stages became operational between 2008 and 2012; Hallett Hill (Stage 2) operational in 2010.

Region SA1
Coordinates -33.56360, 138.86390 (AI)

The Wind Power lists Hallett Hill II (Hallett Hill) at WGS84 -33°33'51" , 138°51'50.2".

MLF 0.9608
DUID HALLWF2
Owner Infrastructure Capital Group Limited
Commissioned
Expected closure 2035
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Suzlon
Turbine model S88-2.1MW
Equipment confidence high
Stats window
06 Jun 2026 22:30 → 13 Jun 2026 22:30 AEST

Dispatch & revenue

06 Jun 2026 22:30 → 13 Jun 2026 22:30 AEST

Energy revenue (× MLF)
$65.5k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
4,010.3 MWh
Available
4,531.7 MWh
Curtailed
642.4 MWh
Curtailment
14.2%
of available
MLF used
0.9608
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9526
2025-07-01 0.9608

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
71 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$323.43M

Shown in table
$323.43M (2026 real AUD)

Reported / source value
$205.70M (2009 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Reported financing amount associated with Hallett Hill 2; used because a direct owner construction-cost disclosure was not located.

Reference
Hallett Hill 2 wind farm in Australia raises $205m in US private placement market (medium confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$4,529,799

Shown in table
$4.53M (2026 real AUD)

Reported / source value
$2.88M (2009 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$2.79M

Shown in table
$2.79M (2026 real AUD)

Reported / source value
$2.00M (2015 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$39,106

Shown in table
$39.1k (2026 real AUD)

Reported / source value
$28.0k (2015 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO/Aurecon benchmark for onshore wind fixed O&M used as fallback.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2015 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No separate variable O&M cost assigned for onshore wind in the benchmark; set to zero.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Plant-specific greenfield capex was not found in a primary owner/government disclosure. The capex figure used is a reported 2015 financing/refinancing amount associated with Hallett Hill 2, not a direct original-construction cost announcement. Onshore wind O&M uses AEMO/Aurecon 2024 benchmark fallback. The plant is operational since 2009 and has 34 x 2.1 MW turbines.

Sources