Wind · Palisade Investment Partner Limited · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
12 Jun 2026 22:30 → 13 Jun 2026 22:30 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9565 |
| 2025-07-01 | 0.9663 |
| Capex total (greenfield) |
$262.71M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,780,020
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$2.00M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$21,186
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.71
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific capex was not directly disclosed as original construction cost; the closest source-backed figure found is Palisade's A$186m refinancing for Hallett 1 Wind Farm. This is used as a proxy for reported project value, not as a benchmark estimate. The wind farm has operated since 2008; capex year set to 2014 only to match the refinancing source year in the absence of a construction-cost source, so this field should be reviewed. For operating assumptions, AEMO 2024 indicates onshore wind is a mature technology with a typical design life of 25 years; variable O&M is not separately stated in the retrieved lines and is set to the provided fallback default.