Gas Peakers · EnergyAustralia Hallett Pty Ltd · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9565 |
| 2025-07-01 | 0.9663 |
| Capex total (greenfield) |
$123.42M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$445,777
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$4.11M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$14,838
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$4.94
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ default |
$12.00
Shown in table |
| Heat rate GJ/MWh |
7.94
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 08 Jun 2026
Notes
No project-specific greenfield capex announcement for Hallett GT was found in the searched sources. The plant is an existing gas-fired station built in 2001 and has an installed capacity of 235 MW on the owner site, while the requested DUID capacity is 276.86 MW; the difference suggests the DUID may represent aggregated or differently scoped units/site naming. O&M and thermal performance were benchmarked from AEMO/Aurecon OCGT reference data; fuel cost was not directly sourced.