Hallett 5 The Bluff WF (BLUFF1)

Wind · Eurus Energy · Wind Turbine - Onshore

Operational AEMO: In Service SA1 Wind - Wind NEM data · 24 hours
53 MW
Registered nameplate capacity
24 hours revenue
$-2.7k
Capacity factor
48.6%
Revenue / MWh
$-4.36
Est. SRMC
$0.77/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
53 MW

AEMO status In Service
Project status Operational (AI)

Wikipedia (2025) states Bluff Range / Hallett 5 was completed in early 2012 and is operational; Eurus Energy project page lists the site as an operating wind farm.

Region SA1
Coordinates -33.38319, 138.79197 (AI)

The Wind Power lists Hallett Hill V / Bluff Range at -33°22'59.5"S 138°47'31.1"E (WGS84).

MLF 0.9579
DUID BLUFF1
Owner Eurus Energy
Commissioned
Expected closure 2036
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Suzlon
Turbine model S88/2100
Equipment confidence high
Stats window
12 Jun 2026 17:20 → 13 Jun 2026 17:20 AEST

Dispatch & revenue

12 Jun 2026 17:20 → 13 Jun 2026 17:20 AEST

Energy revenue (× MLF)
$-2.7k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
612.7 MWh
Available
521.5 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9579
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9467
2025-07-01 0.9579

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
53 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.77/MWh
Capex total (greenfield)
$185.19M

Shown in table
$185.19M (2026 real AUD)

Reported / source value
$120.00M (2010 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Primary owner announcement provides plant-specific greenfield construction cost.

Reference
AGL to construct Hallett 5 wind farm to meet renewable energy supply contracts (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$3,527,337

Shown in table
$3.53M (2026 real AUD)

Reported / source value
$2.29M (2010 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived from reported total project cost and registered capacity.

Reference
AGL to construct Hallett 5 wind farm to meet renewable energy supply contracts (high confidence)
Source recorded 08 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh
$0.77

Shown in table
$0.77 (2026 real AUD)

Reported / source value
$0.50 (2010 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Hallett 5 (The Bluff) is a 52.5 MW onshore wind farm in South Australia. AGL announced a total development cost of approximately A$120 million in February 2010 for construction beginning July 2010 and completion anticipated in December 2011. Operational timing in secondary sources indicates commercial operation by September 2011 / March 2012; capex_year set to the announcement/construction year 2010. No reliable plant-specific O&M benchmark was located in the available search results, so server-side fallback values were not used except for variable O&M default in the provided schema context.