Wind · Eurus Energy · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
14 Jun 2026 00:00 → 14 Jun 2026 03:10 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9467 |
| 2025-07-01 | 0.9579 |
| Capex total (greenfield) |
$185.19M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,527,337
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh |
$0.77
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Hallett 5 (The Bluff) is a 52.5 MW onshore wind farm in South Australia. AGL announced a total development cost of approximately A$120 million in February 2010 for construction beginning July 2010 and completion anticipated in December 2011. Operational timing in secondary sources indicates commercial operation by September 2011 / March 2012; capex_year set to the announcement/construction year 2010. No reliable plant-specific O&M benchmark was located in the available search results, so server-side fallback values were not used except for variable O&M default in the provided schema context.