Wind · Brown Hill North Pty Ltd · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9467 |
| 2025-07-01 | 0.9579 |
| Capex total (greenfield) |
$531.85M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,020,009
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$11.59M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$87,580
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.80
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Project identified as North Brown Hill Wind Farm / Hallett 4. A project-specific reported total cost of A$334 million was found in an owner/operator source, and an additional secondary source reported A$341 million forecast development cost. The A$334 million figure was used as the reported greenfield capex. No refurbishment cost identified. O&M and performance fields use server fallback where plant-specific values were not found.