Guthrie's Gap Solar Farm

Solar · Edify Energy Pty Ltd · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 604h
—
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.20/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates —

DUID —
Owner Edify Energy Pty Ltd
Commissioned —
Expected closure —
Closure date —
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM —
Module / inverter supplier —
Inverter OEM —
Inverter model —
Stats window
01 Sep 2026 00:00 → 26 Sep 2026 04:10 AEST

Dispatch & revenue

01 Sep 2026 00:00 → 26 Sep 2026 04:10 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
—
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.20/MWh
Capex total (greenfield)
$1,100.00M

Shown in table
$1,100.00M (2026 real AUD)

Reported / source value
$1,100.00M (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Combined financing amount for the paired projects.

Reference
Firms act on Edify Energy’s landmark solar power projects (medium confidence)
Source recorded 05 Jun 2026

Capex refurbishment
—
Capex / MW
—
Fixed OPEX (annual)
—
Fixed OPEX / MW-yr
$18,000

Shown in table
$18.0k (2026 real AUD)

Reported / source value
$18.0k (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used server-side default because no project-specific public O&M source was found in the search results.

Variable OPEX / MWh
$0.20

Shown in table
$0.20 (2026 real AUD)

Reported / source value
$0.20 (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used server-side default because no project-specific public variable O&M source was found in the search results.

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 05 Jun 2026

Notes
I found project-level announcements for the combined Smoky Creek & Guthrie’s Gap development, but no reliable public source giving a Guthrie’s Gap-only greenfield capex figure. The Edify project page states Guthrie’s Gap is one of the pair and that the first stage is a 600MW connection with 720MWp of solar and 600MW/2,400MWh of batteries across the combined project. A 2026 contract announcement reported a RM3.12 billion (about A$1.1 billion) EPC contract for the combined Smoky Creek and Guthrie’s Gap projects, and another source described AUD3 billion combined development/project financing. Because these figures appear to cover the combined pair rather than Guthrie’s Gap alone, I did not assign them as site-specific capex.

Sources