Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
14 Jun 2026 00:00 → 14 Jun 2026 02:20 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.8920 |
| 2025-07-01 | 0.9135 |
| Capex total (greenfield) |
$253.16M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
$17.57M
Shown in table Reported / source value How this was derived Reference |
| Capex / MW derived |
$4,219,409
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh |
$1.05
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific greenfield construction cost for Guthega was found in official owner/government sources during search. Snowy Hydro sources confirm Guthega is a 60 MW, 2-unit hydro station commissioned in 1955. A Snowy Hydro announcement in 2017 reported a $13 million generator replacement project for Unit 1 at Guthega; this is a brownfield refurbishment, not greenfield capex.