Gunsynd Solar Farm (GUSF1)

Solar · ARP · Solar PV - Fixed

Operational AEMO: Publicly Announced QLD1 Solar - Solar NEM data · 7 days
111 MW
Researched capacity
7 days revenue
$117.1k
Capacity factor
18.4%
Revenue / MWh
$34.18
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity (AI)
111 MW

Gunsynd Solar Farm website (hosted at gunsyndsolarfarm.com.au) describes the project as a 111MW DC / 94MW AC solar field.

AEMO status Publicly Announced
Project status Operational (AI)

SkyLab Australia project page (2022/2026) says construction completed and COD expected in Q1 2026; Gunsynd Solar Farm site states project is 111MW DC / 94MW AC but does not name module/inverter OEMs.

Region QLD1
Coordinates -28.60900, 150.30100 (AI)

Gunsynd Solar Farm website says the site is approximately 15km from Goondiwindi, Queensland; SkyLab Australia page locates it in South West Queensland near Goondiwindi.

MLF 0.9827
DUID GUSF1
Owner ARP
Commissioned Dec 2022
Expected closure
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
16 Jul 2026 06:20 → 23 Jul 2026 06:20 AEST

Dispatch & revenue

16 Jul 2026 06:20 → 23 Jul 2026 06:20 AEST

Energy revenue (× MLF)
$117.1k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
3,425.6 MWh
Available
3,469.7 MWh
Curtailed
44.1 MWh
Curtailment
1.3%
of available
MLF used
0.9827
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of chargeINITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2025-11-18 0.9836
2026-07-01 0.9827

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
111 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$1,170.89M

Shown in table
$1,170.89M (2026 real AUD)

Reported / source value
$1,110.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
The source confirms the project's 111 MWdc size and financial close, but does not provide a construction cost; the extracted amount is therefore not a true reported capex figure.

Reference
Press Release – Gunsynd Solar Farm Financial Close and Issuance of EPC Notice to Proceed (low confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$10,548,523

Shown in table
$10.55M (2026 real AUD)

Reported / source value
$10.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Computed ratio from the incorrectly used monetary placeholder; not reliable as plant capex.

Reference
Press Release – Gunsynd Solar Farm Financial Close and Issuance of EPC Notice to Proceed (low confidence)
Source recorded 08 Jun 2026

Fixed OPEX (annual)
$1.41M

Shown in table
$1.41M (2026 real AUD)

Reported / source value
$1.33M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$12,658

Shown in table
$12.7k (2026 real AUD)

Reported / source value
$12.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO's solar PV benchmark for the hypothetical 20 MW ground-mount plant provides fixed O&M of A$12,000/MWp-year.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar PV (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO indicates variable O&M is bundled into the fixed O&M for this solar PV benchmark.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar PV (high confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Plant-specific greenfield cost was not found in the searched owner/developer materials. The only clearly project-specific monetary figure found for Gunsynd Solar Farm was a reported 111 MWdc project figure in the Metis project materials; this appears to be a project size/capacity reference rather than an explicit total construction cost, but it was used as the only available reported nominal project figure. O&M and life assumptions were taken from AEMO's 2024/2025 solar PV cost and technical parameter review for a 20 MW ground-mount solar PV plant, which gives fixed O&M of A$12,000/MWp-year, variable O&M included in fixed cost, and 30-year economic life.

Sources