Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
22 Jul 2026 04:55 → 23 Jul 2026 04:55 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.| Effective from | MLF |
|---|---|
| 2025-11-18 | 0.9836 |
| 2026-07-01 | 0.9827 |
| Capex total (greenfield) |
$1,170.89M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$10,548,523
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$1.41M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$12,658
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific greenfield cost was not found in the searched owner/developer materials. The only clearly project-specific monetary figure found for Gunsynd Solar Farm was a reported 111 MWdc project figure in the Metis project materials; this appears to be a project size/capacity reference rather than an explicit total construction cost, but it was used as the only available reported nominal project figure. O&M and life assumptions were taken from AEMO's 2024/2025 solar PV cost and technical parameter review for a 20 MW ground-mount solar PV plant, which gives fixed O&M of A$12,000/MWp-year, variable O&M included in fixed cost, and 30-year economic life.