Gunnedah Solar Farm (GNNDHSF1)

Solar · Gunnedah SF Pty Ltd atf Gunnedah Asset Trust · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 7 days
110 MW
Registered nameplate capacity
7 days revenue
$112.8k
Capacity factor
14.9%
Revenue / MWh
$41.04
Est. SRMC
$0.33/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
110 MW

AEMO status In Service
Project status Operational (AI)

PCL Construction project page (2021): project completed and site referenced as already operational/commissioned after construction; AEMO registration shows In Service.

Region NSW1
Coordinates -30.99080, 150.09960 (AI)

Ironbark Energy project/location page: located 4.5km west of Gunnedah, off the Oxley Highway, northern NSW; approximate site coordinates inferred from project location.

MLF 0.8437
DUID GNNDHSF1
Owner Gunnedah SF Pty Ltd atf Gunnedah Asset Trust
Commissioned Oct 2021
Expected closure 2056
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Canadian Solar
Module / inverter supplier modules and trackers
Inverter OEM Ingeteam
Inverter model CON40
Equipment confidence high
Stats window
07 Jun 2026 07:10 → 14 Jun 2026 07:10 AEST

Dispatch & revenue

07 Jun 2026 07:10 → 14 Jun 2026 07:10 AEST

Energy revenue (× MLF)
$112.8k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
2,748.9 MWh
Available
2,765.0 MWh
Curtailed
16.2 MWh
Curtailment
0.6%
of available
MLF used
0.8437
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8394
2025-07-01 0.8437

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
110 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.33/MWh
Capex total (greenfield)
$261.20M

Shown in table
$261.20M (2026 real AUD)

Reported / source value
$200.60M (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Project-specific greenfield construction/investment cost for Gunnedah Solar Farm.

Reference
Gunnedah Solar Farm EIS (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$2,374,527

Shown in table
$2.37M (2026 real AUD)

Reported / source value
$1.82M (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$2.86M

Shown in table
$2.86M (2026 real AUD)

Reported / source value
$2.20M (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$26,042

Shown in table
$26.0k (2026 real AUD)

Reported / source value
$20.0k (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used only as fallback context; exact solar PV fixed O&M value was not cleanly extracted from accessible lines, so server-side default was retained.

Reference
2024 Energy Technology Cost and Technical Parameter Review (low confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$0.33

Shown in table
$0.33 (2026 real AUD)

Reported / source value
$0.25 (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific variable O&M located; retained default fallback.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Project-specific greenfield capital investment value of A$200.6 million was reported in the EIS for the Gunnedah Solar Farm. The plant is a 110 MWac single-axis tracking solar PV facility. Fixed O&M and variable O&M were not found as project-specific values, so server-side defaults were used only for O&M fallback. No refurbishment capex identified.