Solar · Gunnedah SF Pty Ltd atf Gunnedah Asset Trust · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 17:20 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.8394 |
| 2025-07-01 | 0.8437 |
| Capex total (greenfield) |
$261.20M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,374,527
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$2.86M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$26,042
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.33
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Project-specific greenfield capital investment value of A$200.6 million was reported in the EIS for the Gunnedah Solar Farm. The plant is a 110 MWac single-axis tracking solar PV facility. Fixed O&M and variable O&M were not found as project-specific values, so server-side defaults were used only for O&M fallback. No refurbishment capex identified.