Wind · BEIJING JINGNENG CLEAN ENERGY (AUSTRALIA) HOLDING PTY LTD · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
14 May 2026 19:35 → 13 Jun 2026 19:35 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9498 |
| 2025-07-01 | 0.9620 |
| Capex total (greenfield) |
$256.83M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$0.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific greenfield capex or refurbishment cost could be verified from owner/developer/government sources in the available search results. The available official sources describe Gullen Range Wind Farm as a 73-turbine, 165.5 MW project built by Goldwind Capital (Australia) and later acquired by BJCE Australia, but do not disclose total project investment for the DUID GULLRWF2. AEMO/CSIRO GenCost 2024-25 was located for fallback benchmarking, but the specific onshore wind capex/O&M numeric benchmark values were not retrieved in the available excerpts, so no benchmark values were populated. Wind has no fuel cost or heat rate, and operational emissions intensity is treated as zero.