Gullen Range Wind Farm 2 (GULLRWF2)

Wind · BEIJING JINGNENG CLEAN ENERGY (AUSTRALIA) HOLDING PTY LTD · Wind Turbine - Onshore

Operational AEMO: In Service NSW1 Wind - Wind NEM data · 7 days
111 MW
Registered nameplate capacity
7 days revenue
$243.3k
Capacity factor
18.2%
Revenue / MWh
$71.73
Est. SRMC
$0.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
111 MW

AEMO status In Service
Project status Operational (AI)

Gullen Range Wind Farm site states the first turbines began operating in 2013 and the wind farm was fully operational with all turbines commissioned and exporting electricity on Dec 23, 2014 (gullenrangewindfarm.com).

Region NSW1
Coordinates -34.54100, 149.41200 (AI)

Project location described as centered near Bannister, 11km south of Crookwell and 32km northwest of Goulburn (gullenrangewindfarm.com).

MLF 0.9620
DUID GULLRWF2
Owner BEIJING JINGNENG CLEAN ENERGY (AUSTRALIA) HOLDING PTY LTD
Commissioned Dec 2023
Expected closure 2120
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Goldwind
Turbine model GRW100-2.5MW / GW82-1.5MW
Equipment confidence high
Stats window
07 Jun 2026 04:30 → 14 Jun 2026 04:30 AEST

Dispatch & revenue

07 Jun 2026 04:30 → 14 Jun 2026 04:30 AEST

Energy revenue (× MLF)
$243.3k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
3,391.3 MWh
Available
3,059.4 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9620
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9498
2025-07-01 0.9620

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
111 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.50/MWh
Capex total (greenfield)
$256.83M

Shown in table
$256.83M (2026 real AUD)

Reported / source value
$243.47M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Confirms acquisition and ownership history, but not construction cost.

Reference
BJCE Australia (medium confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$0.50

Shown in table
$0.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No plant-specific greenfield capex or refurbishment cost could be verified from owner/developer/government sources in the available search results. The available official sources describe Gullen Range Wind Farm as a 73-turbine, 165.5 MW project built by Goldwind Capital (Australia) and later acquired by BJCE Australia, but do not disclose total project investment for the DUID GULLRWF2. AEMO/CSIRO GenCost 2024-25 was located for fallback benchmarking, but the specific onshore wind capex/O&M numeric benchmark values were not retrieved in the available excerpts, so no benchmark values were populated. Wind has no fuel cost or heat rate, and operational emissions intensity is treated as zero.

Sources