Solar · New Gullen Range Wind Farm Pty Ltd · Solar PV - Fixed
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
14 Jun 2026 00:00 → 14 Jun 2026 05:15 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9498 |
| 2025-07-01 | 0.9620 |
| Capex total (greenfield) |
$33.51M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,351,351
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$790.6k
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$79,058
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.27
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific greenfield CAPEX of $24.8 million was reported by the project website for construction completed in 2017. The project was originally forecast at $25.3 million in ARENA materials. Fixed OPEX is inferred from the reported 2018 OPEX of $585,030 and annualised on a 10 MW basis; this is an estimate rather than a directly reported per-MW fixed OPEX figure. The farm was commissioned in August 2017 and initially exported at reduced capacity (9.17 MW AC), reaching 10 MW in August 2018 after inverter retrofits. Solar PV has no fuel cost or heat rate.