Griffith Solar Farm (GRIFSF1)

Solar · Griffith Solar Farm Pty Ltd · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 22h
27 MW
Registered nameplate capacity
22h revenue
$399
Capacity factor
1.9%
Revenue / MWh
$35.52
Est. SRMC
$0.35/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
27 MW

AEMO status In Service
Project status Operational (AI)

griffithsolarfarm.com.au project page describes the site and its grid connection as an existing operating solar farm; Power Technology 2024 says the project is currently active.

Region NSW1
Coordinates -34.26600, 146.03000 (AI)

Griffith Solar Farm project site says the plant is approximately 7 km south-east of Griffith, NSW; NSW SSD-6604 planning documents place the site in that area.

MLF 0.8921
DUID GRIFSF1
Owner Griffith Solar Farm Pty Ltd
Commissioned
Expected closure 2042
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Longi
Module / inverter supplier PV modules and single-axis tracking solar farm supplier
Inverter OEM SMA
Inverter model inverter model not documented
Equipment confidence medium
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 22:00 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 22:00 AEST

Energy revenue (× MLF)
$399
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
11.2 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.8921
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8424
2025-07-01 0.8921

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
27 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.35/MWh
Capex total (greenfield)
$75.28M

Shown in table
$75.28M (2026 real AUD)

Reported / source value
$54.50M (2016 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
ARENA news release states the Griffith Solar Farm project cost was $54.6 million.

Reference
Griffith Solar Farm secures $5 million ARENA funding (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$2,768,527

Shown in table
$2.77M (2026 real AUD)

Reported / source value
$2.00M (2016 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated from reported total project cost divided by registered DUID capacity supplied by user.

Reference
Griffith Solar Farm secures $5 million ARENA funding (medium confidence)
Source recorded 08 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

How this was derived
AEMO/Aurecon source confirms a solar PV fixed O&M benchmark exists, but the exact extract was not sufficiently accessible here to verify a numeric site-specific value.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (low confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$0.35

Shown in table
$0.35 (2026 real AUD)

Reported / source value
$0.25 (2016 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used the user-provided fallback because no verified plant-specific variable O&M was found.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Plant-specific greenfield capital cost was reported by ARENA as $54.6 million for Neoen Australia’s Griffith Solar Farm (25 MW AC / 30 MW project class). This does not exactly match the registered DUID capacity of 27.19 MW, so capex_per_mw is calculated on the site-reported project size/cost basis, not AEMO benchmark data. Construction began in January 2017 and operations commenced on 16 April 2018. Solar PV asset life assumed from operator guidance of 25–30 years; midpoint used.