Greenbank BESS (GREENB1)

BESS · CSE BESS Pty Ltd · Storage - Battery

Commissioning AEMO: In Commissioning QLD1 Other - Other NEM data · 16h
200/400 MW
Registered nameplate capacity / storage
16h revenue
$-931
Capacity factor
-2.3%
Revenue / MWh
Est. SRMC
$1.54/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
200 MW / 400 MWh

AEMO status In Commissioning
Project status Commissioning (AI)

Consolidated Power Projects project page (2024–2025) describes Greenbank BESS scope including commissioning; AEMO status is In Commissioning as of the provided asset data.

Region QLD1
Coordinates

MLF 1.0045
DUID GREENB1
Owner CSE BESS Pty Ltd
Commissioned Jun 2025
Expected closure 2044
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Tesla
Battery platform / chemistry Megapack
Inverter OEM
Inverter / PCS model
Equipment confidence high
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 16:10 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 16:10 AEST

Energy revenue (× MLF)
$-931
FCAS revenue (× MLF)
$258
FCAS volume
698.2 MWh
Dispatched
-74.0 MWh
Available
815.7 MWh
Curtailed
898.8 MWh
Curtailment
110.2%
of available
MLF used
1.0045
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-12-17 1.0033
2025-07-01 1.0045

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
200 MW / 400 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.54/MWh
Capex total (greenfield)
$307.38M

Shown in table
$307.38M (2026 real AUD)

Reported / source value
$300.00M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
CS Energy states the Greenbank Battery is a $300 million project.

Reference
Greenbank Battery (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MWh storage derived
$768,443

Shown in table
$768.4k (2026 real AUD)

Reported / source value
$750.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Per-MWh capex was calculated from the reported project investment and stated storage capacity.

Reference
Greenbank Battery (high confidence)
Source recorded 08 Jun 2026

Fixed OPEX (annual)
$3.28M

Shown in table
$3.28M (2026 real AUD)

Reported / source value
$3.20M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO’s BESS review indicates annual O&M for batteries is highly variable and suggests fixed O&M is typically quoted on a $/MW basis; a midpoint-style proxy was used to populate the field.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 08 Jun 2026

Fixed OPEX / MW-yr
$16,393

Shown in table
$16.4k (2026 real AUD)

Reported / source value
$16.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO provides indicative battery O&M values and notes they are highly variable between OEMs; a proxy value was selected for the requested output.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$1.54

Shown in table
$1.54 (2026 real AUD)

Reported / source value
$1.50 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M figure was located; batteries commonly have negligible variable O&M under long-term service arrangements.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Plant-specific reported capex found in CS Energy fact sheet: $300 million investment for the 200 MW/400 MWh Greenbank Battery, commissioned in June 2025. Fixed O&M not explicitly published for this asset; used AEMO 2024 BESS indicative annual fixed O&M excluding extended warranties of $1.8m-$7.46m total annual O&M across size cases, selecting a midpoint-style proxy of ~$16,000/MW-yr for a 200 MW battery as a fallback estimate. Variable O&M is typically treated as negligible for BESS long-term service agreements; a small default of $1.50/MWh was retained from server-side fallback. No fuel or heat rate applies.