Wind · Granville Harbour Operations Pty Ltd as trustee for Granville Harbour Operations Trust · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. TAS1 regional price (RRP) on right axis.
14 Jun 2026 00:00 → 14 Jun 2026 03:10 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9473 |
| 2025-07-01 | 0.9555 |
| Capex total (greenfield) |
$370.37M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,318,731
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$8.12M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$72,751
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.66
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Project construction and financial close announcements consistently cite a $280 million total project cost for the 112 MW Granville Harbour Wind Farm; the project reached commercial operations in 2020. Fixed OPEX was not found project-specifically and server-side default was used. Capacity-normalised capex uses 111.6 MW registered capacity.