Granville Harbour Wind Farm (GRANWF1)

Wind · Granville Harbour Operations Pty Ltd as trustee for Granville Harbour Operations Trust · Wind Turbine - Onshore

Operational AEMO: In Service TAS1 Wind - Wind NEM data · 30 days
112 MW
Registered nameplate capacity
30 days revenue
$2.40M
Capacity factor
37.6%
Revenue / MWh
$79.50
Est. SRMC
$0.66/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. TAS1 regional price (RRP) on right axis.

Key information
Capacity
112 MW

AEMO status In Service
Project status Operational (AI)

Palisade Group asset page (2026) describes Granville Harbour Wind Farm as an operating 111.6MW wind farm.

Region TAS1
Coordinates -41.80000, 145.10000 (AI)

NS Energy (2019) and Palisade/Atmos project pages place the site on the north-west coast of Tasmania, about 35km north-west of Zeehan; precise public coordinates not clearly published.

MLF 0.9555
DUID GRANWF1
Owner Granville Harbour Operations Pty Ltd as trustee for Granville Harbour Operations Trust
Commissioned Dec 2020
Expected closure 2055
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Vestas
Turbine model V126-3.6 MW
Equipment confidence high
Stats window
15 May 2026 04:45 → 14 Jun 2026 04:45 AEST

Dispatch & revenue

15 May 2026 04:45 → 14 Jun 2026 04:45 AEST

Energy revenue (× MLF)
$2.40M
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
30,204.9 MWh
Available
30,188.6 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9555
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9473
2025-07-01 0.9555

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
112 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.66/MWh
Capex total (greenfield)
$370.37M

Shown in table
$370.37M (2026 real AUD)

Reported / source value
$280.00M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Owner/developer announcement gives total project cost of $280 million.

Reference
Palisade reaches financial close of Granville Harbour Wind Farm (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$3,318,731

Shown in table
$3.32M (2026 real AUD)

Reported / source value
$2.51M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated from reported total project cost divided by registered capacity.

Reference
Palisade reaches financial close of Granville Harbour Wind Farm (high confidence)
Source recorded 08 Jun 2026

Fixed OPEX (annual)
$8.12M

Shown in table
$8.12M (2026 real AUD)

Reported / source value
$6.18M (2018 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

How this was derived
Calculated as default fixed OPEX per MW-year multiplied by 111.6 MW.

Fixed OPEX / MW-yr
$72,751

Shown in table
$72.8k (2026 real AUD)

Reported / source value
$55.0k (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific fixed O&M source found; server-side default used.

Variable OPEX / MWh
$0.66

Shown in table
$0.66 (2026 real AUD)

Reported / source value
$0.50 (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific variable O&M source found; server-side default used.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Project construction and financial close announcements consistently cite a $280 million total project cost for the 112 MW Granville Harbour Wind Farm; the project reached commercial operations in 2020. Fixed OPEX was not found project-specifically and server-side default was used. Capacity-normalised capex uses 111.6 MW registered capacity.

Sources