Grange Avenue (GRANGEAV)

Gas Peakers · EDL LFG NSW Pty Ltd · Reciprocating Engine - Spark ignition

Operational AEMO: In Service NSW1 Renewable Biomass or Waste - Landfill Gas NEM data · 5h
1 MW
Registered nameplate capacity
Est. SRMC
$60.13/MWh
Key information
Capacity
1 MW

AEMO status In Service
Project status Operational (AI)

Region NSW1
Coordinates

DUID GRANGEAV
Owner EDL LFG NSW Pty Ltd
Commissioned
Expected closure 2025
Closure date
Technology Reciprocating Engine - Spark ignition
Fuel Renewable Biomass or Waste - Landfill Gas
Plant supplier
Boiler / turbine equipment
Stats window
23 Jul 2026 00:00 → 23 Jul 2026 05:10 AEST

Dispatch & revenue

23 Jul 2026 00:00 → 23 Jul 2026 05:10 AEST

No dispatch data for DUID GRANGEAV in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Waste / landfill gas
Capacity
1 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$60.13/MWh
Capex total (greenfield)
$3.32M

Shown in table
$3.32M (2026 real AUD)

Reported / source value
$3.15M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$2,637,131

Shown in table
$2.64M (2026 real AUD)

Reported / source value
$2.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$66.5k

Shown in table
$66.5k (2026 real AUD)

Reported / source value
$63.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$52,743

Shown in table
$52.7k (2026 real AUD)

Reported / source value
$50.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$3.16

Shown in table
$3.16 (2026 real AUD)

Reported / source value
$3.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
$6.33

Shown in table
$6.33 (2026 real AUD)

Reported / source value
$6.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Heat rate GJ/MWh
9.00

Shown in table
$9.00 (2026 real AUD)

Confidence: low · Status: ai estimated · Capex basis: estimated · AI checked 08 Jun 2026

Notes
Grange Avenue is an existing landfill-gas power station operated by EDL LFG (NSW) Pty Ltd. Publicly accessible sources confirm the site and operator, and indicate a landfill-gas reciprocating engine installation at Marsden Park, NSW. No reliable plant-specific greenfield capex figure was located, so capex is estimated from the provided fallback. The 1.26 MW capacity aligns closely with public references that describe the site as ~1.25 MW. Fixed OPEX annual was not calculated because the request supplied a per-MW default and the schema supports either form; if needed, fixed OPEX annual would be about AUD 63,000 using the fallback rate.

Sources