Wind · Goyder Wind Farm 1B Pty Ltd as trustee for Goyder Wind Farm 1B Trust · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
07 Jun 2026 05:35 → 14 Jun 2026 05:35 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9641 |
| 2025-07-01 | 0.9689 |
| Capex total (greenfield) |
$472.26M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table How this was derived |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No project-specific greenfield total investment figure was found in the searched sources. The available official sources confirm Stage 1B is 203.5 MW and under Neoen's Goyder South project, but they do not state a standalone capex total for this DUID. Pending a plant-specific cost announcement, capex remains unfilled. Operating cost defaults were not substituted because the prompt prioritizes search-backed values; only zero variable OPEX and zero emissions intensity were carried as technology defaults for wind.